Bill 44 Active — Updated August 2026

Mission SSMUH Multiplex & Gentle Density Guide

Mission adopted SSMUH regulations on June 30, 2024, allowing up to 4 units on serviced residential lots. SSMUH has largely shaped the forms and patterns of future infill and intensification across Mission's urban community. A separate Transit Oriented Area near the West Coast Express station enables even higher density with up to 10 storeys.

Bill 25 and the June 30, 2026 deadline

The Province passed Bill 25, the Housing and Municipal Affairs Statutes Amendment Act, on November 27, 2025. It widened what counts as a "restricted zone": a zone is now restricted if any parcel in it is limited to a single detached home and/or a duplex, including zones that allow a house with a secondary suite or a detached accessory dwelling unit.

In a restricted zone, the minimums are 3 units on parcels of 280 m² or less, 4 units on parcels over 280 m², and 6 units on parcels over 280 m² that sit within 400 m of a frequent-service bus stop, with no off-street parking minimum in that last case. A stop counts as frequent service when at least one route is scheduled at least every 15 minutes on average, Monday to Friday 7 a.m. to 7 p.m. and Saturday and Sunday 10 a.m. to 6 p.m.

Local governments had to update their bylaws by June 30, 2026 unless they were granted an extension; infrastructure-related extension requests were due to the Minister by June 1, 2026. That deadline has now passed. Where a local government has not complied, the Minister of Housing has the authority to impose the zoning directly by order.

Compliance has not been uniform across the region, so before you design to a specific unit count, confirm the current bylaw status for your lot with the municipality.

Source: Province of BC, Small-scale multi-unit housing

Mission's SSMUH Zoning Framework

On June 30, 2024, the District of Mission adopted SSMUH zoning amendments to the master Zoning Bylaw 5949-2020 to comply with BC's Bill 44 Small-Scale Multi-Unit Housing legislation. A companion TOA Bylaw 6292-2024 was adopted on September 9, 2024, establishing higher-density rules near the West Coast Express station.

Eligible lots must have municipal water and sanitary sewer connections. Existing R1, R2, and R3 zones are being consolidated into new R4-L and R4-S zones to simplify the residential zoning framework across the district. SSMUH has largely dictated the forms and shapes of future infill and intensification throughout Mission's urban community, with standard allowances of 3 to 4 units based on lot size.

Unit Allowances by Lot Size

Lot Size Requirement Max Units
< 280 m2 Municipal water + sanitary sewer 3 units
≥ 280 m2 Municipal water + sanitary sewer 4 units

Lots within 400 m of the West Coast Express station are excluded from SSMUH and follow TOA rules instead. District of Mission SSMUH Page

Transit Oriented Area (TOA) Density Tiers

Properties within 400 m of the West Coast Express (WCE) station are governed by TOA Bylaw 6292-2024, adopted September 9, 2024. These lots are excluded from standard SSMUH and instead follow significantly higher-density rules organized into two tiers:

TOA Tier Distance from WCE Station Max FSR Max Height
Tier 4 Within 200 m 3.5 FSR 10 storeys
Tier 5 200 - 400 m 2.5 FSR 6 storeys

Source: District of Mission TOA Page

Zone Consolidation: R1/R2/R3 to R4-L & R4-S

Mission is consolidating three existing residential zones into two new SSMUH-compliant zones under Zoning Bylaw 5949-2020:

R4-L (Large Urban Residential)

Replaces larger-lot portions of existing R1, R2, R3 zones

R4-S (Small Urban Residential)

Replaces smaller-lot portions of existing R1, R2, R3 zones

This consolidation streamlines the residential zoning framework, ensuring consistent SSMUH regulations across all eligible properties.

Draft Official Community Plan & Bill 25 Compliance

Mission has drafted a new Official Community Plan under Bylaw 6350-2025, which is currently available for public engagement. The new OCP reflects the district's evolving housing priorities, including alignment with SSMUH and TOA frameworks already in place.

Separately, the Province's Bill 25 required municipalities to update their bylaws by June 30, 2026. That deadline has now passed. Mission had been working toward compliance, and as of August 2026 the District has not published an adopted Bill 25 alignment bylaw. Confirm the current status with Mission Planning before relying on a specific unit count.

Mission SSMUH Regulation Snapshot

Height & Buildings

  • Current height: 9.5 m; proposed increase to 10.5 m (34.4 ft)
  • Roof pitch bonus: +12% for pitches ≥ 7:12 (up to ~11.7 m)
  • Max 4 buildings per lot

Parking Requirements

  • Principal unit: Proposed 1.5 stalls (reduced from 2.0)
  • Accessory unit: 1.0 stall per unit
  • Tandem parking permitted
  • Garage setback: Min 3.0 m regardless of building height

Lot Coverage & Impervious Surfaces

  • Urban compact: 35% lot coverage, 50% impervious max
  • Other urban: 30% lot coverage, 50% impervious max
  • Suburban: 20% lot coverage, 30% impervious max

Housing Progress

  • 133 units completed toward 2025 annual target
  • 64% of 2025 annual target (211 units)
  • 1,798 units 5-year housing target

Water Supply Infrastructure Limitations

  • Mission has identified water supply capacity constraints in certain service areas that may limit SSMUH development
  • The District has requested a 5-year extension from the Province for areas with insufficient water infrastructure
  • All SSMUH-eligible lots must have municipal water and sanitary sewer connections
  • A minimum 6.0 m setback from undevelopable areas (e.g., slopes, watercourses) is required

Confirm servicing availability with the District before proceeding with site acquisition or design.

How VanPlex Supports Mission SSMUH Projects

Concept to Permit

We coordinate architects, engineers, and consultants to ensure your Mission SSMUH project aligns with Bylaw 5949-2020 and the new R4-L or R4-S zone requirements. From servicing confirmation to height optimization with roof pitch bonuses, we handle the regulatory complexity.

Feasibility Analysis

Comprehensive analysis of your Mission lot's SSMUH potential, including zone classification, servicing availability, TOA proximity, unit configurations, and pro forma projections accounting for lot coverage and impervious surface limits.

Request Your Mission SSMUH Feasibility

Share your Mission address to receive a tailored analysis including your SSMUH zone, unit allowance, servicing status, TOA eligibility, and development pro forma.

Getting Started with Mission SSMUH

Before beginning your Mission SSMUH project, follow these steps:

  • Confirm your lot has municipal water and sanitary sewer connections -- properties without both services are not eligible
  • Determine whether your property falls within the TOA boundary (400 m of WCE station), which triggers higher-density TOA rules instead of SSMUH
  • Check your current zone (R1, R2, or R3) and understand the transition to R4-L or R4-S under the zone consolidation
  • Review lot coverage limits (20-35%) and impervious surface maximums (30-50%) based on your area classification
  • Verify minimum 6.0 m setback from any undevelopable areas (slopes, watercourses, geotechnical hazards)

Contact Mission Planning: For zoning and SSMUH questions, email planning@mission.ca or call 604-820-3748. City Hall general inquiries: 604-820-3700, 8645 Stave Lake Street, Mission, BC.